The power
behind progress.

Custom control cabinets, built by robots.

Schematic in. Cabinet out.

Custom control cabinets have been built by hand for decades.  At Vetaion, we are transforming this process. Instead of printed schematics, tape measures and hand drills, our cabinets are guided by software and built by robots, saving time and reducing cost in the process.

Our process.

Schematic

You send your schematic.

Send your cabinet schematics as an EPLAN file.

Digital Replica

A 3D digital replica is created.

Every component, wire and label is 3D modelled and inspected for errors in VetaionOS before building begins.

Components

Components are placed.

Components are precisely placed on the rail.

Wiring

Wiring is completed.

Wires are machine-manufactured and then connected manually.

Finished Cabinet

Your cabinet is inspected.

Your cabinet is inspected to IEC 61439 (VDE 0660-600) and then delivered to you.

Why choose Vetaion?

Up to
60%

Reduction in production time

Within
24h

To provide a quote

Up to
15%

Reduction in production costs

Get a quote.

Upload your file(s): EPLAN file, PDF schematic or Excel BOM.

Your request is reviewed by the team.

You will receive a quote within 24 hours.

Or write to [email protected]
Name
Company
Email
Phone
Message (optional)
Documents
upload file here
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Explore our Knowledge page to find out more about how we work and what’s going on in the industry.

Questions buyers ask us.

Each control cabinet undergoes a comprehensive test in accordance with the applicable VDE standards before delivery. The results are documented in a detailed test report, which is handed over to the customer together with the technical documentation.

Each control cabinet undergoes a comprehensive test in accordance with the applicable VDE standards before delivery. The results are documented in a detailed test report, which is handed over to the customer together with the technical documentation.

Each control cabinet undergoes a comprehensive test in accordance with the applicable VDE standards before delivery. The results are documented in a detailed test report, which is handed over to the customer together with the technical documentation.

Each control cabinet undergoes a comprehensive test in accordance with the applicable VDE standards before delivery. The results are documented in a detailed test report, which is handed over to the customer together with the technical documentation.

Each control cabinet undergoes a comprehensive test in accordance with the applicable VDE standards before delivery. The results are documented in a detailed test report, which is handed over to the customer together with the technical documentation.

Each control cabinet undergoes a comprehensive test in accordance with the applicable VDE standards before delivery. The results are documented in a detailed test report, which is handed over to the customer together with the technical documentation.

Careers

Join us and shape the future of automated manufacturing.