The powerbehind progress.
Custom control cabinets, built by robots.
Schematic in. Cabinet out.
Custom control cabinets have been built by hand for decades. At Vetaion, we are transforming this process. Instead of printed schematics, tape measures and hand drills, our cabinets are guided by software and built by robots, saving time and reducing cost in the process.
Our process.
Schematic
You send your schematic.
Send your cabinet schematics as an EPLAN file.
Digital Replica
A 3D digital replica is created.
Every component, wire and label is 3D modelled and inspected for errors in VetaionOS before building begins.
Components
Components are placed.
Components are precisely placed on the rail.
Wiring
Wiring is completed.
Wires are machine-manufactured and then connected manually.
Finished Cabinet
Your cabinet is inspected.
Your cabinet is inspected to IEC 61439 (VDE 0660-600) and then delivered to you.
Why choose Vetaion?
Reduction in production time
To provide a quote
Reduction in production costs
Get a quote.
Upload your file(s): EPLAN file, PDF schematic or Excel BOM.
Your request is reviewed by the team.
You will receive a quote within 24 hours.

Explore our Knowledge page to find out more about how we work and what’s going on in the industry.
Questions buyers ask us.
How is the quality of finished cabinets checked?
Each control cabinet undergoes a comprehensive test in accordance with the applicable VDE standards before delivery. The results are documented in a detailed test report, which is handed over to the customer together with the technical documentation.
Which automation technologies are used in production?
Each control cabinet undergoes a comprehensive test in accordance with the applicable VDE standards before delivery. The results are documented in a detailed test report, which is handed over to the customer together with the technical documentation.
How is the digital replica created?
Each control cabinet undergoes a comprehensive test in accordance with the applicable VDE standards before delivery. The results are documented in a detailed test report, which is handed over to the customer together with the technical documentation.
Who handles materials procurement?
Each control cabinet undergoes a comprehensive test in accordance with the applicable VDE standards before delivery. The results are documented in a detailed test report, which is handed over to the customer together with the technical documentation.
Which documents are needed for a binding quote?
Each control cabinet undergoes a comprehensive test in accordance with the applicable VDE standards before delivery. The results are documented in a detailed test report, which is handed over to the customer together with the technical documentation.
How does Vetaion achieve such short delivery times?
Each control cabinet undergoes a comprehensive test in accordance with the applicable VDE standards before delivery. The results are documented in a detailed test report, which is handed over to the customer together with the technical documentation.
Careers
Join us and shape the future of automated manufacturing.
